Updates

bathroom renovation in Central London, Finsbury Park, N4Bathroom renovation in Central London, Haringey, Finsbury Park N4 - one of many projects our bathroom installers completed recently. The bathroom was quite small, design - very simple, yet contemporary. This flat is rented out - and such design is just what tenants need. So for your judgement (and perhaps some ideas) here we present the images and comments

Read more...

bathroom-refurbishment-13Just a little while ago we completed bathroom refurbishment in London, Chingford N4. The previous fitters (cowboy fitters, as we know them) did quite a bad job, thus the customer wanted to redo it properly. Although this was just a partial refurbishment, it took almost as much work and time as to refurbish it in full - just some tiles were left in place, all the appliances were changed and bathroom retiled.

Read more...

home-refurbishment-london-holloway-n7-41A week ago we completed a one more London refurbishment project - flat in Holoway area, N7. The flat will be rented out - thus the overall costs had to be as minimum, as possible. Although the customer purchased some equipment and fittings which were quite expensive for rental purposes, in my opinion. Again, here you will see project pictures: how the property looks once all is finished, and how it looked before...

Read more...

bathroom installation in islingtonRecently we completed a bathroom installation in Islington, London N7 area. This property was to be let out, thus the project costs had to be kept to a minimum. The property cried for an extensive refurbishment - bathroom and toilet were in really bad condition: comments and pictures here.

Read more...

property refurbishment muswell hillJust after New Year we completed a property refurbishment London, Muswell Hill N10. The whole project took about 6 weeks, involving the removal of some partitions, building new walls, stripping all of the old appliances and equipment. This property was very outdated and we think we achieved the best result, converting this property into a modern home. Here you may take a look at the final results and see the work progress from start till the end.

Read more...

bathroom installation North London, N10Just after New Year we completed a bathroom installation in North London property, in Muswell Hill, N10 area. The property was very outdated and we converted it into a modern home. The whole project (involving also kitchen renovation and painting decorating throughout) took about 6 weeks: here you may take a look how we progressed.

Read more...

bathroom renovation in londonOn New Year eve we completed one more shower and bathroom renovation in London property, in St. Johns Wood, N10 area. The bathroom was quite recently renovated, so we just did a partial update (mainly replacement of sanitary equipment and some tiling) - here you may see how the work progressed.

Read more...

bathroom-installation-london-highbury-N5-15A little while ago we completed a bathroom refurbishment in London, Highbury N5. The whole work took only a week and a half, involving the removal of old toilet, wash basin, radiator, tiles, laminate flooring, tiling and installation of new sanitary units. Here you may take a look at the final result and few pictures of how it looked before - perhaps these pictures will inspire you for some upgrades at your own home.

Read more...

flat-refurbishment-london-st-johns-wood-nw8-31Just after Christmas we finished one more project - flat refurbishment London, St John's Wood, NW8. This project with few minor issues went smoothly from start to finish, involving some stripping of ceiling papers, removing partition, updating bathroom and shower room, etc... Here you may take a look at the flat refurbishment stages, picture by picture - perhaps you will get some inspiration for your own home.

Read more...

Last week we did some minor refurbishment in Muswell Hill – some minor repairs in the basement of a private house. The customer there had some problems with damp. The back garden was paved long ago - there are some cracks in the pavement, slabs are coming right up to the basement walls, and the worst thing about it is that the pavement is sloping towards the house. So, when it’s raining water collects and then goes into external walls, into the basement.

Read more...

office refurbishment east finchleyRecently we have finished office refurbishment in London, East Finchley. Project with minor delays went smooth from start to finish – the customer did his part of job on time (supplied fittings and equipment, any questions discussed and solved promptly). The duration of project – approximately 6 weeks. We had one experience in this project that I will happily share with you here.

Read more...

Copyright © 2010-2012 AZbuilders - quality home renovations